|
|
Sett Paving Works Tema Harbour, Ghana
|
|
|
|
|
|
|
Concrete sett paving 90,000 m² on 5 cm sand layer, 15 cm cement stabilization layer and 30 cm sub base course; ground stripping 20,000 m², demolition of foundations 3,000 m², surface concrete and asphalt 40,000 m², asphalt fixing 3,500 m², 700 m cable trench with prefabricated blocks, reinforced concrete and lean concrete.
>> Back
|
|
|
|
|
|
|
|
|